March 22, 20233 yr I have to connect my foul water drainage to the treatment plant. What do I need to put in place where the 2 pipes exit the foundations A + B : a) to satisfy building regs b) ease of access. Can I just join A and B and then a single pipe to the treatment plant or should I take both pipes to a point near the treatment plant? Thanks
March 22, 20233 yr Inspection chamber at both and run A in to B then single run to the treatment plant.
Create an account or sign in to comment