May 4, 20224 yr I'm having a little studwork created at one end of my wet room just up again what would in theory be the end of the wet room tray that is going in. It's just 2x4 treated timber. My question is do I need to treat it or paint it with anything to completely protect it from any moisture or dampness built before it is tiled? As in the same stuff you would tank a wetroom in? It will be moisture plasterboarded of course and then tiled straight onto after that.
May 4, 20224 yr You need to liquid tank it. Plus use the proper tape at internal corners and junction with the floor. https://m.youtube.com/watch%3Fv%3DhpoOHm4LiUE&ved=2ahUKEwjcrsr08Mb3AhWA8LsIHSWZCv8Qxa8BegQIBxAF&usg=AOvVaw2OSXc9j_QtUPz8xkvEO9OT
Create an account or sign in to comment