Search the Community
Showing results for tags 'secondary hot water tank'.
-
Only my second post here. Oak Frame SIP panel house now erected but a lot of construction work still to do including plumbing and heating systems. House is entirely off grid so no mains gas or electricity. We will have a large PV solar array on adjacent modern barn, with large battery storage. Thermal Store of 300 litres with inputs from Immersion ( which detailed calculations show will be sufficient for 8 months of the year), small LPG boiler and a wood burning back boiler. Outputs will be for DHW and UFH. The issue is with the wood burning back boiler which unfortunately is as far away from the TS as is possible- a full 17metres and on the same ground floor. It may be possible to move the TS to the 1st Floor, but house not desiigned for this, so weight may be an issue, in any case it would still be 17metres from the back boiler. From everything I have read back boliers are inherently dangerous due to boiling / explosion risks and reliance must not be placed on an electric circulating pump as it could breakdown. There will be an upstairs radiator / towel rail or two to act as a heat sink - but is that enough ? My suggested solution is to install a small ( maybe 100 litres) secondary HW tank upstairs very close above the log burner and have the log burner heat the water in that tank ( which would be open vented with a header tank in the loft) then pipe the water in that tank to the TS using an electric pump. That HW would in turn heat the TS via a heat exchanger (or directly). I realise that there would be some losses in the system and the pipe work from the secondary tank to the TS would need to be very highly insulated and relevant valves and stats would need to be incorporated to ensure that the secondary tank didn't inadvertantly cool the TS when the log burner not in use. Thoughts welcome? Andrew ( PS actually this is my daughters house and I'm not convinced that she and her husband or their plumber fully appreciate the dangers or complexity of their project)
- 1 reply
-
- log burner
- secondary hot water tank
-
(and 1 more)
Tagged with: