I am doing a lot work myself but getting trades in to push things on when required, the story so far: Demolished old house summer 2017, piled raft foundations installed done Aug 2017 due to adjacent trees, treatment plant and drainage field installed autumn 2017, Bricklayers on site end of March 2018, beams and joists June/July 2018, bricklayer back to take up to wall plate August 2018, Roof trusses delayed, finally lifted on 29th November 2018, January brick layer back to take chimney up though roof frame, Roofers arrived mid-February last tile (plain tiles) installed April 18th 2019, PIR insulation installed on sloping ceilings May 2019, first floor windows installed June 2019, soffit and facia July, august 2019, gutter September/October 2019, porch roof timbers December 2019, nogging for first floor walls and some ground floor windows January 2020, currently snagging the roof, chimney leak, window in wrong place etc. hope to get secure and scaffold down soon. Do I wish I never started? Yes on some days. Best trade so far: the brick layer, now retired I was his last build. he was full of experience. "why do you want to do that?" he would say. the house is better because him. If I did it again, I would do it differently, may be the errors would be different as well! (140m2 two storey house)
- 4 replies
-
- 1
-
- replacment dwelling
- block and brick
-
(and 1 more)
Tagged with: