I’m hoping you can help me steer my architectural technician in the right direction with these drawings he’s done for me. It seems the arch tec wants to build the 1990s way, with concessions to the latest building regs. I want to build the Build Hub way. I don’t have an architect (although I have recently looked into bringing one on board). I drew the house myself to achieve PP & now I’m relying on an arch tec to get my design through full plans BR approval & then do the construction drawings & notes, so I can continue building (we’ve already built up to the B&B floor).
This Sketchup shows a very early draft design for my house (the chimney has since been deleted & other improvements have been made, including reducing glazing). I’m seeking advice on the detail for the big dormer that hangs over the edges of the first floor.