Hi All, I'm a bit more than half way through a bungalow conversion into an upside down house in the Caerphilly area of South East Wales.
Timber frame is up, most of the external block work too, roof membrane is next on the list with glazing install after that.
Looking forward to getting the downstairs slab insulated ready for UFH and screed.
It's been a journey and a half so far. Learned lots from this forum so, many thanks to the contributors here.
Ta, Firbeck.