I need the benefit of your experience please . I’m in the middle of building a 105sq metre extension and looking at UFH possibilities. I had to leave the job as my wife was ill and It looks like my mate may have dropped a clanger in construction of the slab . From the bottom up we have a min 150 mm compacted dolomite , visqueen then 120mm Celotex ,reinforcing mesh on that then 150 mm concrete. I have approx 70mm to FFL . My question is with what I have would an overlay system something like egg crates with say 40mm of liquid screed work , or should I have more insulation on top of the slab .? Or is there a better method / system , thanks in advance.