Hi.
We bought a house with a large extension that had already been started which included the foundation and some of the blockwork. It was all signed off by
building control before we bought it (according to the building control officer).
Unfortunately, upon starting work to finish it our builder found that the foundation is not level (as was the blockwork 🤦🏼♀️) despite building control signing off on it all.
My question now is:
when we level the floor, should we do this with the screed layer on top of the insulation (so the screed will be thicker in some rooms) or should we level it out before we lay the insulation down so the screed on top will be an equal thickness across the whole extension. Or another options I haven’t thought of? The extension is approx 90m2 so it’s a fairly big area.