  1. Thanks Nod, appreciate your comments.
  2. Thanks Nick, very much appreciated.
  3. Evening, I'm having a micro cement floor applied in three weeks. I've had to take up a small section of asphalt flooring in the porch area to a depth is 50mm. I now need to fill back in to prepare for micro cement. The problem I have is that the floor isn't level so if I used a self levelling screed it would just run to the lowest point. I need to fill with a material that can be applied thick enough to allow a gradually slope. Then I can finish with a thin layer of screed. Due to me only having three weeks, I need a material that is quick drying and with will not give me a problem with moisture. I'm told that cement can take a long time to lose its moisture. Any help and suggestions will be very much appreciated.
×
×