Hello, I submitted a planning application to drop a further 6 kerbs outside my property. My local council has come back and asked me to add existing and proposed site levels to my Site Plan. I cannot afford to approach a surveyor, so I have been researching how to measure site levels. I believe that once I have established a datum point, i can simply use string and a spirit level to take measurements on how the site levels increase or decrease in relation to my datum point.
Can I just place a brick on the centre of the site and measure levels out to each of my boundaries in a 360 fashion and measure and plot the site levels in relation to that brick?
I have attached a photo showing the site to provide some context. I would be grateful for any responses.
This is an extract from my LPA "Any proposal involving new buildings or floor space and any groundworks e.g. access tracks, hard surfaced areas etc. require the submission of existing site levels. This information can be shown on the existing Site Plan. Offsite levels of land and buildings immediately adjoining the site are also useful.*
Thank you