Hi
I am due to pour concrete into these footings and as you can see the pour also creates a padstone underneath existing concrete floor to support a steel column which will be load bearing. The concrete will be poured to about half up the existing floor slab. Do I need anything underneath the existing floor slab like a bonding agent before pouring the new concrete?
all help appreciated