Scotland have got it right if I had known I should have had it done at design stage however 2 years to obtain planning permission things have changed we have 90mm wingspan cooltherm in the walls 150mm wingspan in the floor 200mm wool between floors and 300mm in the loft ,triple glazing and air to air heat pump with air conditioning ( which isn’t recognised in saps) but we are still 1 kw short ( everything will be sealed for airtest