I live adjacent to where building work has commenced to build a small two storey property.
We were served with a party wall agreement, as 5 of the piles are within 3 metres of our home and others are 6 metres, the furthest being around 14 metres. We appointed a joint chartered surveyor with the builder.
The piling has differed to that stated in the piling RAMS of a depth of 4-5 metres, in that the piles are going much further into the ground than first anticipated, with all going as much as 20m below ground level. There are a total of thirty piles in a very small area. It has taken 11 days so far.
It goes without saying that there is significantly more piling undertaken to that which was proposed and has caused a significant level of additional vibration to our property.
I feel the builder is inconsiderate. He is piling 20 metres deep, causing intense vibration every second of every working day, up to 8 hours, for the last two weeks. We have cracks around our window frames and soil deposits appearing in between the block paving path.
The continuous pulsating under the house and shaking within every room makes me feel sick with worry.
I feel powerless to do anything and don’t know what repercussions we will have in the future. Can anyone advise?