I am prepping for extension and alterations. The existing building has copper pipe running in the screed to existing rads. and as this must be a 50 year old system, time for update before it all goes wrong!
Intending to insulate all existing exterior walls with 50mm PIR (or maybe Knauf) between studwork which will be fixed to 50x25 batten against wall (empty cavity), 18mm OSB covering studs and then 12mm placo. As this creates an area to run pipework through, I intended to drop new pipes down to rads in this fashion. Herewith my dilemma, plastic or copper?
I would like to use plastic because of it's simplicity but others have argued against it, preferring copper. I shall revert to copper through the wall to connect to rads, but still have the thing for plastic otherwise.
So, what way to go???