I am doing a detached garage conversion and have a question on dpc and dpm.
Walls are single leaf cavity block and existing dpc is 45 mm up from concrete slab.
I plan to DPM the slab and run it 150mm up the walls, then 75mm insulation, then floating 22m chipboard t&g.
As the level of the new floor will be over the level of the dpc in the wall, is that a problem I.e. the dpc will be buried half way up the floor insulation.