Hi everyone. I thought I'd give an update and take the opportunity for to thank everyone for their input. It gave me the confidence to get this job done and gave me some extra pointers to think about that I hadnt considered.
So, both the RSJs are up, I used a bunch of strong boys to support the former outer leaf and props with planks to support the joists in the kitchen. Everything went smoothly after a bit of thought about the order of propping one side, getting RSJs into the room, strongboys on the other side etc.
I have taken the walls under the new RSJs down to the DPc at floor level but would like to ask about what the best plan is for closing the cavities on both sides. I've seen these cavity closers but wanted your input first.
Let me know if pics would help.
Cheers,