Hi, I have recently been given a very high quotation by SP Energy Networks and was looking for some advice. I have acquired a workshop (planning was only given in October) with some land with a view of putting a shepherd hut on the ground with a hot tub and using the workshop for working on a couple of project cars. There is a High Voltage pole 10 meters from the workshop on my ground, I realise that I will need a transformer so I thought I would get a quote for a new connection. When I initially contacted SPEN the woman on the phone said that she would be doing the quotation and asked if I could do some of the work myself to keep the costs down which I was more than happy with, it is known as contestable work and is shown on her workings out. She said that it would be in the region of £6k which was fine, when I received the quote it was nearer £18k!! If I did the contestable work it was £49 more than if SPEN did all the work themselves!!!
There are a lot of different charges on the documents not all that I properly understand but it does seem that they have hit me with everything they can including a charge for hand delivering the letters! I have contacted the same woman from SPEN and was told she was sorry but that was the price.
I have attached a docs from SP Energy Networks and any advice on possibly reducing the costs would be great unless you think that it is a fair price! Thanks