Firstly nice to join the forum.
Im doing a fair bit of renovation now in prep for a rear double story extension I'd like to do in a year or 2. I would like to install an ASHP eventually after extending so just want to future proof myself now while I have the chance.
I estimate the house need is 8kw currently and c. 15kw post extension.
Im looking to install 28mm pipe from boiler to hot water cylinder, and then 28mm from there to centre of house, then teeing to 2x 22mm feeding each side of the existing house and then 15mm at rads. All in copper. The reason for not running 28mm all the way is a steel RSJ getting in the way.
When the extension is done, I fully suspect BC will request it to be a seperate zone. I was planning to run 28mm from water cylinder teeing to 22mm for upstairs and 22mm downstairs.
Any thoughts, concerns or advice?