I was considering 2 options:
A: run the vapour barrier along the underneath of the joist, up the side of the joist, across the underside of the OSB, down the side of the next joist, under the joist etc. Then stick it to the block wall. I could notch the joists where required in advance for electrics. Then use a butyl tape on the underneath of the joists when installing the plasterboard.
B: add further insulation between the joists and underneath the OSB. Then install the VCL under the joists, up a bit of the sides of the joists to leave room for spotlights and services, across the underneath of the insulation, down the side of the next joist, etc. Again using butyl tape on the underneath of the joists when slabbing and sticking the VCL to the walls.