well i have forgotten a lot but there are still aspects on building im not sure on, brickwork groundwork ect.
im working on the brickwork ( its tricky ) but getting there haha
im stuck waiting on engineers calcs for an internal steel and possible concrete pads under the opening of the original back wall so cant pour the slab, im adding 2 mtrs on the back of an existing extension and obviously bc want to see type 1 sand dpm x2 insulation etc etc but i cant do that yet . wil bc mind if i start on external brickwork as im waiting cheers
hi im new here,
im a time served chippy with 40 yrs experience roofing/ first fix second fix/ a bit of exabition work / shop fitting high end work stuff . own biz /subby/site management like the bespoke tbh
hopefully i can help maybe, just a chippy really bottom line