Thanks for replying but I don’t think I made myself clear.
I am building over a garage extension which will have a pitched roof. I am building above the garage about a metre in.
I have to put 2 steels in to take both leaves. Do I make the steels longer which would bridge the cavity as I have to return the brickwork 90 degrees.
Thanks