Hello all, relighting and old thread,
I have a similar scenario and need a bit of advice. I am applying cladding to my concrete block garage as the wet weather is seeping through the blocks. The main garage wall is west facing and takes the brunt of the rain and then small beads of water can be seen on this inside of the wall.
A question about the membrane, can it be applied directly to the block wall and then batten on top or does it have to be attached/stapled to batten?
i.e.
wall - batten - membrane - batten - cladding
or can it be
wall - membrane - batten - cladding
I don't really want to double up on the battens as it will cause a further protrusion.
Thanks in advance,
Matt