Hi all, I'm currently at the point of an extension being completed which has entailed 3 metre bi-fold doors being fitted. They are already fixed on the outer leaf (ie flush) on DPM so doesn't provide me with an option of using a cavity closer. The flooring up to the inner leaf is lined with visqueen, concrete, celotex and screed, however, there is a cavity gap which needs to be bridged as I wish to lay engineered wood flooring (this will run parallel to the doors).
My builders take the **** out of me as they say I spend too much time Googling but all I want is to ensure things are completed correctly and mitigate the risk of damp transfer! One of the builders has suggested using wood noggins but feel inevitably this would fail over time.
I was looking into two possible solutions but wanted to seek someone's expert views;
The first possible solution is to use a combination of celotex and compacfoam but obviously needs to be sufficiently strong enough to support the weight of a person stood on the flooring.
The second and my preferred option is to place visqueen in the cavity creating a sort of bathtub which will be filled with concrete, however, im not sure if I risk damp issues using this option.
Can someone provide the correct advice in resolving this. I want to ensure there is no risk of damp tracking across the threshold or of course flooring giving way!
I have provided a library image which is almost identical to my situation.
Thanks in anticipation.