Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Question : sequence of internal lining

Featured Replies

Hello

SIPS build. 

  1. Plan detail : external cladding/strapping/barrier/OSB solid insulation OSB/strapping/void/25mm PIR foil both sides/12.5 plasterboard
  2. Looking on kingspan website as below it has the 25mm foil insulation next to OSB then strapping/plasterboard 
  3. Neither setup have an internal,vapour barrier 
  4. are both correct 1.& 2. do o need a vapour barrier?

 

🤯🤯🤯

thanks in advance 

7E943019-D5EB-4343-9947-1CF8552E277F.jpeg

I imagine they will say that the TW55 is the VCL, which is true as long as all joints and perimeters are taped to within an inch of their lives and nobody pokes a screwdriver or a fingernail through the foil.

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.