Skip to content
View in the app

A better way to browse. Learn more.

BuildHub.org.uk

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Suspended floor slab overlap question.

Featured Replies

We are going to be casting a suspended floor slab with steel mesh inside with an overall thickness of 200mm. We have been told that we need an overhang of 150mm on the foundation, so all good there. Overall floor size is approx 4 x 3m. On the 3m span all is good with the thicker bars of the rebar getting there full 150mm overhang. Problem is on the 4m span on one foundation I can get the 150mm overhang but the other one I am only getting approx 100mm. Before I speak with the BC or SE will this be acceptable as I have the thick bars of the mesh both on the required 150 mm overlap or will I be expected to get the full 150mm on all four edges?

Create an account or sign in to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.