Hi Folks
If I use a suspended concrete ground floor, how best should the ground below be finished?
I know that the the ground needs cleared of topsoil, 150mm void, and periscope ventilators will be required. However, should I put down a layer of blinding, or hardcore topped with blinding, or can I get away with leaving the earth exposed?
The area I'm in does not require any radon gas layer, and the stony clay is about 1 to 1.3m deep before bedrock is hit.
Thanks,
Chris