Just signed on the dotted line with MBC for our timber frame and slab. My question is on building regs.
What exactly is needed for building regs? I believe MBC / their SE provide calcs for the structure / slab which covers off that bit.
Does anyone have a list of what else is needed?
What other drawings might be required (even if not for building regs)? And are these needed at the start? Or can we sort those as we go along. Our architect is trying to scare us......
+1 to all the contributions so far.
I have built a MBC timberframe house and used an independent BCO. I started off by sending a full MBC design package, including SE Caculations and foundation design, asking to be advised of anything else that was required for BC approval. I received the following " Do you have a building regs specification as I need to do a plan check and comment on compliance with the building regs ..."
I then responded "Not sure what you require for