Hi All
Just looking at the bathrooms on the 1st floor of our timber frame
It is posi joists and decking at the moment and i am trying to confirm if it can achieve a wet room with sunken shower trays
Many thanks for your experiences (good and bad!)
bob
You need more arms than Vishnu to fit it without wrinkles . Bloody sticky stuff, but ridiculously bombproof, and excellent for a 1st floor install. Get more of it if funds allow and finish the room, with upstands, to get it utterly waterproofed.
Is it 610? The stuff Impey give you in a mastic tube? It is the anti-Christ of sealants, and is STILL on some old combats and STILL wet / tacky to the touch!