200mm EPS. I've done the calculations using previously supplied document that @A_L linked here  taking in to consideration the depth below ground.   although it's just occurred to me that the recent change I've made to the insulation levels at ground level has removed 30mm PIR from the slab. s**t. think I need to do some more quick calculations to make sure what I've done hasn't completely messed up my desired U-values. ?‍♂️