Lhs line is the main vent stack with basement toilet connecting to it, them to the right we have the basin and shower, and finally utility sink / DW in next room. We originally had the toilet in same line as main soil stack from above, but BC asked us to put it in with basin and shower for some reason as it obviously meant the toilet line would be more than 6m unvented.