As part of installing IWI to our house, we're thinking about what we can do with the first floor joists that are currently pocketed into the external walls. We're considering shortening them by fitting a wall plate and hangers to bring them within the thermal envelope. Something like this;
From what I understand the new plate should be bolted through the wall to the outside, which I'd rather not do. Are there any other options?