@SuperJohnG I have SIP with a blockwork outer skin on an insulated raft foundation.   The way it worked for me is I first of all had a soil survey done to get a ground bearing capacity.  Architectural Technician did my house design which I gave to SIP company and asked them for the point and line loads.  They used their SE to get this for me (incl in cost of the SIP supply/install package).   I then contacted Tanners and provided him with the soil survey report and the line/p
    • Thanks
    1