Hopefully a quick question.   Background installing an unvented cylinder. Location is remote from the cold water manifold, preventing connection of the balanced port to the cold supply.   House already has a PRV just after the stop cock set at 2.5 bar.   Cylinder comes with a combined inlet set, set at 3 bar.   Can I just blank the balanced line off?  Do I need the second PRV to comply with regs?