As @Nickfromwales suggested, if you put a 25mm EPS sheet down first and then your DPM on top you instantly reduce the likelyhood of getting holes in it. Then do what you like with PIR or EPS. If you're installing UFH, the pipe clips struggle in EPS so having an EPS build up with a 25mm - 50mm PIR on top aswell really does help (alot)!   We've got 325mm (300mm EPS100 & 25mm PIR) and then a Cemex Cemfloor @ nominal 45mm which is great. With hindsight I would have gone with 50mm
    • Like
    1