Hi All,
My new build will have a beam and block floor. My architect has shown 65mm sand and cement screed. The 1st screed installer I contacted has said I would need 75mm flowing concrete with steel fibres or the floor will bounce. The 2nd installer said not and that I would be best with 50mm standard liquid screed.
Any thoughts?
Cheers