Jump to content

Build variation latitude post BC application approval.


epsilonGreedy

Recommended Posts

How much flexibility is there in the BC inspection process for varying construction specifics mid-build and hence after initial submission of building control drawings?

 

Some specifics examples that could apply in my case:

 

  1. Switching from roof trusses to a cut roof.
  2. Switching from a basic beam and block floor to a more elaborate insulated floor design using inter beam insulation blocks.
  3. Raising dpc by two bricks.
  4. Eliminate the hallway and drop the stairs directly into the sitting room (bit of a stretch case this one :ph34r: ).
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...