I have alot of steel frame in the loft space and within stud walls.  BCO suggested i plasterboard the entire first floor in pink plasterboard.

I have asked him to email me the regulations on this but he has yet to do so.  I have tried googling but cannot find a definitive answer.
 

 I did read that standard pb gave 30mins that was adequate, however this was 2 years ago.  Anyone able to confirm either way?

Posted

2 layers of 12.5mm plasterboard or 1 layer of 15mm FireLine board achieve half an hour. The requirement will be covered under ADB and from memory, is included within the Appendix. 