Jump to content

Getting Desperate for a 3 Phase Meter


Andrew

Recommended Posts

We originally had a single phase temp electrical supply to our build, but in December last year this temporary supply was moved into the garage and upgraded to a 3 phase supply. We have high electrical demand with 2 x electric car charging, 12kW ASHP, 2 x double ovens, etc and the electrician has done his planning and diversity calcs based on having a 3-phase supply into the garage + house. We are part way through the 2nd fix and a 3 phase consumer unit has been fitted. 

 

The problem is that we only have a single phase meter attached to the incoming supply and I'm tearing my hair out trying to get a 3-phase meter installed. Originally the temp supply was with British Gas then we switched to Ebico to take advantage of the zero standing charge, but ironically they were bought by British Gas and we ended up back with British Gas. I called BG early in January this year and enquired about having the meter swapped to 3-phase. They said during lock down they are not doing any meter swaps. So I contacted Octopus and asked them if they were installing 3-phase meters during lock down. 'Yes' came the reply, so we switched to Octopus going on supply at early Feb.  Since then I seem to have been caught in a nightmarish loop of broken promises and declarations of 'it'll be a few weeks'. Latest excuse is that the 3-phase smart meters are stuck in the Suez canal - I kid you not. 

 

I've lodged a formal complaint today but I'm coming to the conclusion they they either can't or don't want to install a 3-phase meter for us. Btw I'd like it to be a smart meter but at this point I will take any 3-phase meter if it gets us connected, something I've told Octopus repeatedly. I don't think it will be possible to move into the house until the 3-ph meter is installed and our very busy electrician is using it as an excuse to stall 2nd fix. 

 

So I think I'm going to have to switch providers again to get the 3-phase meter installed. The question to the wisdom of BH is - does anyone have any experience of an energy supplier who will be able to quickly install a 3 phase meter for us? I really don't want to switch again and be no further forward. TIA.

Link to comment
Share on other sites

They are all clueless, you are as well waiting.

 

I had 2 smart meters booked in for last week, 2 properties, different addresses, 3 doors apart they turned up with one meter.. not the fitters fault. Said only one postcode can be done in a day???

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...