On 19/07/2020 at 11:38, Thedreamer said:

 

For our site we had a electricity pole on our field but it couldn't support another household so had to go back to the transformer. 

 

I don't suppose anyone knows what the power rating of the typical transformers they stick up a pole is please? One site I'm looking at has such a transformer just about 100m away from the build site on the edge of the land which is supplying just one other property: if it were possible to connect into the LV side of that it will obviously save a pile of money over a short 11KV link + another transformer.

  • Like 1
Link to comment
Share on other sites

1 hour ago, tregoningmatt said:

I've now met with a low voltage planner and HV planner who came out to site, spoken to the HV planner yesterday and he said there is no room for negotiation, the price is the price, also that the volt drop on the 300m run to our place ruled out putting in 3 phase and doubling the voltage...there is 11000 volts going into the existing pole at the bottom of our track so basically we are being asked to pay £35K to take the HV supply 150m further up our track. Unfortunately the other transformer in the hamlet is the same distance away, so no help there. Competition in Connections is a farce if you're a domestic customer who just wants 1 connection. Will keep trying...

Sorry not read the whole of this thread, but I'm surprised about the volt drop statement for 3 phase over 300m. My situation was:

  • My barn conversion is about 750 meters across 2 fields and a wood to nearest transformer (using by another farm).
  • Initial quote was £52,000 from the DNO. 
  • There preferred solution was to bring HV line across fields ending with a transformer at my property.
  • I got the phone number of the chap organising the solution in the area (not the initial quote person) and had lots of conversations with him.
  • In the end I got the quote down to about £8K
  • However I had to dig the trench across the fields etc and lay my own cable (which was around £16K just for cable).

However the point about voltage drop doesn't add up. My solution in the end was to run a 2 phase (which in theory would have more voltage drop for the same thickness cable). However I ran an incredibly thick cable and doubled up the phases with my meter box (and therefore the DNO responsibility) just by the transformer (which is a large distance from my actual house). A found a commercial electrical company who ran the numbers for the voltage drop (ie a computer program). I'm all connected now with no issues and not much of a voltage drop at all.

  • Like 1
Link to comment
Share on other sites

4 minutes ago, Reiver said:

 

I don't suppose anyone knows what the power rating of the typical transformers they stick up a pole is please? One site I'm looking at has such a transformer just about 100m away from the build site on the edge of the land which is supplying just one other property: if it were possible to connect into the LV side of that it will obviously save a pile of money over a short 11KV link + another transformer.

 

Depends. The one I wanted connecting to was only 25KvA and they had to upgrade it to 100Kva for me to connect to which I had to pay for (well a portion)

Edited by gc100
  • Like 1
Link to comment
Share on other sites

  • 6 months later...

I've had a quote for £50k, 2 connections, nearest pole 900m away along a country C road.

 

And one for £30k, 2 connections nearest pole 500m away going over private farm land (assuming the land owner is OK with it + solicitors fees etc).

 

No experience on the subject but reading the thread those numbers seem about right.

 

Apart from negotiating the quote down as the poster above did, not sure there are any other alternatives? Apart from going off grid!

  • Sad 1
Link to comment
Share on other sites

  • 4 weeks later...

CB90AE3D-5C1A-473E-AE04-A17BCB62F9C7.thumb.jpeg.cb4964918fd4ab4c742dfbf82c6190d4.jpeg

 

I’ve just been quoted £3100 for this connection. 1m run under the pavement outside my ground and 10m run insid my ground. They’re pushing to install a 3 phase connection when I don’t want 3 phase and I can’t find anything online that says I have to have a 3 phase supply either. Its to future proof against EV charging but I’m a petrol head and no EV will ever be parked on my driveway. 
I’ll be phoning them first thing in the morning as I think thats absolutely ridiculous to try and charge me £3100 for that. I’ll supply the ducting and dig the trench on my property. I also want an internal meter box and they’ve quoted for external. 

Link to comment
Share on other sites

1 hour ago, dpmiller said:

what provider? Some *really* don't like internal meters.

I had this issue! Office staff deemed it ok so we proceeded with the ducting etc. When insp came he was not happy about the ducting, another story, but even less with the internal meter. When I told him it was a Passive house and had been sanctioned with his planning people he told me he needed to make some calls. When he came back he begrudgingly told me all was good but he was not happy, what I wanted to say to him was suck it up buttercup but thought better of it!

Link to comment
Share on other sites

We have an internal meter (SSE installed) but frankly I'd have preferred it outside in a kiosk. We periodically get meter readers dropping by, and we need to bring them through the house and into the plant room to read the meter. I'd much rather be pointing them to an external box.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...