Just out of interest (as I need to get this nipped pretty rapid so won't be changing tradesmen) what is the going rate for render work? I'm having a silicone render put on, 10mm basecoat and 1mm silicone IIRC? and the rate is £50/m2 incl materials.

 

At the time I was looking for a renderer this figure tallied roughly with the cost breakdowns I got back from Estimators Online so I didn't interrogate it any further. Now I'm catching up on budget stuff I was curious if this is good value or not?

Share this post


Link to post
Share on other sites

With a 10 mil base I presume it’s on block work 

40-50 is average 

 

Top coat is normally 3 mil

Edited by nod

Share this post


Link to post
Share on other sites
1 hour ago, nod said:

With a 10 mil base I presume it’s on block work 

40-50 is average 

 

Top coat is normally 3 mil

Yep, on blockwork. So I'm there or thereabouts on pricing which is good to know, thanks.

Share this post


Link to post
Share on other sites

You can have a straight k rend onto the block if you want to bring it down to 30 m2

Share this post


Link to post
Share on other sites

@LA3222 how did you finally get on with this in the end?

 

I'm just getting some prices back and seems I might have underestimated heavily. 

 

I'm getting quoted 70/m2 for rendering. see here for doing 195m2:

 

image.thumb.png.8fff848ed281fe8a9ecd95fa2644be47.png

 

I'd (likely wrongly!) used 23 for material and 26 for labour for Monocouche render on cement board. I assumed this was supply of board, mounting, and then render finish. Does this seem stupid now? @nod would you be able to help shed any light if I'm miles off. 

 

Slowly bit by but my budget seems to be getting blown to pieces.

Share this post


Link to post
Share on other sites
1 hour ago, SuperJohnG said:

@LA3222 how did you finally get on with this in the end?

 

I'm just getting some prices back and seems I might have underestimated heavily. 

 

I'm getting quoted 70/m2 for rendering. see here for doing 195m2:

 

image.thumb.png.8fff848ed281fe8a9ecd95fa2644be47.png

 

I'd (likely wrongly!) used 23 for material and 26 for labour for Monocouche render on cement board. I assumed this was supply of board, mounting, and then render finish. Does this seem stupid now? @nod would you be able to help shed any light if I'm miles off. 

 

Slowly bit by but my budget seems to be getting blown to pieces.

Yes mate, my render is all done now. Total cost worked out at £50/m2. I paid for the materials direct and deducted that from the renderers bill so I can VAT back - so if take VAT out it is around £47/m2.

 

There were some sections originally to be clad in render board etc. Renderer said he works his price on £50/m2 - the sections of render carrier made no difference.

 

Where abouts are you?

  • Like 1

Share this post


Link to post
Share on other sites

Thanks @LA3222

 

I'm Glasgow area.  

 

That figure ties in with what the local render supplier estimates for my job (10k for 200m2), for Labour and material for K rend TC15,  so my price may be somewhat overpriced. 

 

However I seem to have omitted to add the actual cost of the render board itself in my budget. 

Edited by SuperJohnG

Share this post


Link to post
Share on other sites

70 is very high

Special self builder rate

 

  • Thanks 1

Share this post


Link to post
Share on other sites

Just an update on this...I have just been quoted 90 per sqm for TC15 on renderboard. Materials and labour. 

 

Seems someone is pulling leg maybe? 

Share this post


Link to post
Share on other sites
Posted (edited)

We've had a few round. Nobody has actually been interested enough to price. The Sto guy was saying their prices start around £100m2. Have another Sto guy calling round tomorrow... Apparently he could be closer to £70m2... But I'm not holding my breath. Not yet got prices from any of the other "cheaper" systems.

 

 

This is Northern Ireland btw, supposedly one of the cheapest regions....

Edited by Conor

Share this post


Link to post
Share on other sites
On 26/06/2020 at 13:03, nod said:

With a 10 mil base I presume it’s on block work 

40-50 is average 

 

Top coat is normally 3 mil

I've been quoted circa 40 pm2 for cash for this so it seems not to bad

Share this post


Link to post
Share on other sites
18 minutes ago, Ronan 1 said:

I've been quoted circa 40 pm2 for cash for this so it seems not to bad

Be wary of cash for render 

You will need a guarantee 

Beware of the guy that skimmed your house that does render also 

  • Thanks 1

Share this post


Link to post
Share on other sites
54 minutes ago, nod said:

Be wary of cash for render 

You will need a guarantee

This is the bit that worries me. Although 90 sqm seems excessive. Do you think? (Scotland btw. Central belt).

Share this post


Link to post
Share on other sites
6 hours ago, nod said:

Be wary of cash for render 

You will need a guarantee 

Beware of the guy that skimmed your house that does render also 

Hi Nod thanks for the good advice. He's a fair sized plastering contractor that does alot of work for me through our company ( currently rendering 2 apartment blocks and is about to get 2 more smaller ones) the cash element is soely to get it a few quid cheaper.

 

He will stand over his work as a promise to his cousin my director so I'm happy enough that way

Share this post


Link to post
Share on other sites

You should be fine then 

Always worth looking at previous jobs 

  • Thanks 1

Share this post


Link to post
Share on other sites
5 hours ago, SuperJohnG said:

This is the bit that worries me. Although 90 sqm seems excessive. Do you think? (Scotland btw. Central belt).

90 is double what I’m charging  building companies 

But contractors no self builders options are limited at the moment 

  • Thanks 1

Share this post


Link to post
Share on other sites

I've just had an updated quote. £8841 for labour only applying K rend TC15. This includes fitting all beads etc. 

 

Thats for around 195sqm including the windows area as that. 

 

Thats £45 per sqm the work looks good. But is he ripping the pish?  

 

Also wants 25% deposit up front 8 weeks before he even starts? 

 

I'm desperate to get it done before winter. If I don't I'll need the scaffold for an extra 3-4 months at maybe 2500 extra. 

 

Share this post


Link to post
Share on other sites

If you cannot get someone cheaper then it is tough.

 

But really a 25% deposit on a labour only job. What does he need that for?

Share this post


Link to post
Share on other sites
On 06/09/2021 at 16:14, AliG said:

If you cannot get someone cheaper then it is tough.

 

But really a 25% deposit on a labour only job. What does he need that for?

 The deposit was a red herring. That  was if he was buying material so sorted now. I've booked him and seen his work now that looks excellent. K rend rep reckons he'd only recommend this guy ans one other in Scotland to do the work so here's hoping it's good. 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now