Building control insecption stages


Bazh

Recommended Posts

Hi,

 

At the stage where the first fix for electrician is done and the plumber is starting the floor insulation for the underfloor heating,then the pipes for it, do i need to get in touch with them to come out to check before the screed goes down or do they come after?

 

thanks

Link to comment
Share on other sites

Is it different in England?

 

My last BC inspection was when the timber frame was completed but not insulated and no non structural internal walls.  I asked him what is the next inspection stage and his reply was "Completion"